OK September 19 Update.
First the entrance wall gets finished up
the back wall is coating is done.
The mechanical room has been finish coated and the electric panel box is installed.
Wood pannels (of marine plywood ) installed to hold the solar water heating pannels.
Wood strips added to top of beams to take the glass roof panels.
Wood strips added to top of beams to take the glass roof panels.
Next we get the glass roof, solar panels, tile, paint walls, windows and doors.
Still a long way to go before water goes in.