Wednesday, July 15, 2015

The pool Second posting

THE POOL PROJECT CONTINUES
July 14 posting

Next they built re-bar column towers, these will form posts in the walls.


details


they are long


and tall


up they go..


close up of how they sit on the square base


almost all set up and the cement follows


it seems a complicated maze


in all the destruction the embattled Magnolia offers up a bloom


Piers exposed in wall footing trench


footings for the wall bases start


all footings are in


footings for the mechanical room done too


up go the forms  for the wall bases


another load of cement arrives those are 100 lb bags!!




Mixing sand, gravel, cement then add water


Base for walls take shape


Wall bases are done and pool excavation down 3 feet done


Rock as waiting to go in 


Then we discovered a problem, the bottom of the hole is Jello mud so adding large gravel and trying to firm up with vibrator/tamper.


After the gravel improved the base, "a little", they came back with the large rocks and created a surprisingly level floor for the insulation to lay on and then re-bar and cement for the floor of the pool will be next but that's another posting.


More soon.