Saturday, September 19, 2015

OK September 19 Update.

First the entrance wall gets finished up


the back wall is coating is done.


The mechanical room has been finish coated and the electric panel box is installed.


Back wall and window openings  now in finished size and coated 

and the inside of entrance wall is getting its finish coating.

Wood pannels (of marine plywood ) installed to hold the solar water heating pannels.

Wood strips added to top of beams to take the glass roof panels.



Entrance steps starting to take shape.


and the finished steps now ready for tile.


On the other end the mechanical room before the skim coat of cement.


That end is now completed as are the front walls.


On closer look the boys now have access up the entrance steps and are exploring.


Next we get the glass roof, solar panels, tile, paint walls, windows and doors.
Still a long way to go before water goes in.