Saturday, August 22, 2015

Well progress has been made this week
here is our posting for August 22nd

They first installed more horizontal steel for the wall top cap


when that was poured all the way around they laid more brick on the back wall and installed yet another row of steel and cement for the final cap


Here is a shot of the back wall with window openings and final height


Mean while they started coating the raw bricks with cement - here is how they do it



Front wall is finished this weekend 
It will be painted white later to match the house


at the far end the roof of the mechanical room takes shape



After much deliberation we chose our tiles for the pool and floor and they have arrived


They started the finish on the interior walls and should be finished with all wall finishing by end of next week.


Back and frount walls stand ready for the roof beams

and we took delivery of the beams after Hugo our job manager hand picked them out in Otavallo


We are accumulating quite a large amount of scrap wood from forms for concrete work. We will have lots of firewood to cut up when done.


See ya next week

Thursday, August 13, 2015


OK WELL THINGS HAVE BEEN BUSY
ALREADY AUGUST 13TH!! WOW
HERE'S OUR UPDATE

After the pool floor area was stabilized with larger rock they filled the area with a layer of concrete and then lined the cavity with heavy plastic sheeting



Next came the rigid foam insulation


then the steel for the pool floor and walls and the cement truck arrives to pour the pool floor


the pour begins after much environmental damage positioning the cement pump and the truck


everyone is engaged in the pour


Almost done


Leveled as they went


Then the finishing machine smooths everything out


Next morning forming up for pouring the walls


Lots of steel (i thought we were putting in a prison)


Pool takes shape after pour and forms removed


rough plumbing goes in



Crew moves excess dirt from outside wall into the inner cavity and also cleans up the area


area looks much better after cleanup


Inner cavity/floor area is back filled to get ready for pouring floor


Floor drains go in


Ready for pouring of floor



Walls have gone up quickly


Ane on inspection tour






Almost ready for roof beams