Thursday, August 13, 2015


OK WELL THINGS HAVE BEEN BUSY
ALREADY AUGUST 13TH!! WOW
HERE'S OUR UPDATE

After the pool floor area was stabilized with larger rock they filled the area with a layer of concrete and then lined the cavity with heavy plastic sheeting



Next came the rigid foam insulation


then the steel for the pool floor and walls and the cement truck arrives to pour the pool floor


the pour begins after much environmental damage positioning the cement pump and the truck


everyone is engaged in the pour


Almost done


Leveled as they went


Then the finishing machine smooths everything out


Next morning forming up for pouring the walls


Lots of steel (i thought we were putting in a prison)


Pool takes shape after pour and forms removed


rough plumbing goes in



Crew moves excess dirt from outside wall into the inner cavity and also cleans up the area


area looks much better after cleanup


Inner cavity/floor area is back filled to get ready for pouring floor


Floor drains go in


Ready for pouring of floor



Walls have gone up quickly


Ane on inspection tour






Almost ready for roof beams