Sunday, March 4, 2012

Week 36 - Feb 4, 2012

Well there is lots of things to update this week, we start with the X Spot showing finished outside paint. (inside is 90%done too)
Going around the house here is shot from SE corner.
and now from the NE corner.
and on around to the right front NW corner of the house.


Went over Thursday last week and the house was a beehive of activity see the following activities:
1. finishing up the office fireplace chimney.
2. Hardwood floors going in.
3 and 4. Windows and gutters being installed.
5. Pit being dug for the Septic system.(later to be filled in as it filled up with water).
On Saturday we found the pits filled in and ditch being dug for city sewer hookup.
6. back to activity on Thursday: Stairs finally going in. (soon Ane will see the upstairs)
7. the tile work was finished in guest bathroom;
here is the accent tile work in shower. 
8. And there was a team in the Master bathroom also laying tile. Here is the results
Here in the shower we have a niche for shampoo and soap
Continuing with the Saturday Photos; the Living area wood floor is installed 
And the Entryway tile is awaiting the installation of the Flower of Life
We recieved the Flower Ceramics and laid it out on our Living Room floor, very happy the way it looks, it will be installed next week!!
Here is a closeup of the Dining room window with final coat of finish.
Well that's all for this week. 
We are really getting excited and hope to be moving in about 3 weeks.




No comments:

Post a Comment